Bravilor FreshOne Fresh Brew Coffee Machine
Delicious fresh coffee
At the press of a button the FreshOne offers freshly brewed filter coffee, by the cup or decanter. This machine is equipped with one canister and a separate hot water tap for tea or soup.
Elegant design with stainless steel housing, fast and simple operation and reduced maintenance.
The Bravilor Bonamat unique hot water system makes the machine less susceptible to scale formation. The FreshOne is pre-prepared for communication with various paying systems.
Automatic machine for freshly filtered coffee served by cup, with connection for mains water supply 3/4 inch.
Fitted plastic drip-tray, automatic indicator, descaling and rinsing programme.
FreshOne with 1 canister four strengths of coffee plus hot water
Amount of canisters: 1 x 3,6 litres
Brewing time: approx. 20 seconds per cup
Throughput per hour: approx. 20 litres
Rating power 230V~ 50/60Hz: 2300W
Dimensions (wxdxh): 373x476x748 mm
Colour: dark-grey
*This machine will be installed by Bravilor
please make sure installation guidelines are followed
To ensure your installation is completed efficiently, please note Bravilors conditions for installation
The Site MUST:
Have the electrical supply within 1 meter of the centre line of the machnies proposed location.
Have the correct electrical supply for the ordered machine ready on site. E.g. single or three phase.
Have a 15mm copper pipe mains water supply terminating with shut off valve incorporating a 3/4 inch BSP connection within 1 meter of the machines centre line at the proposed location.
Have site water pressure within the operating range of 1 -10 bar. (15 - 150psi).
Ensure that if the counter or unit requires any holes drilling to enable the engineer to site the machine, these must be completed before the engineer arrives on site.
Ensure the machine is immediately available to the engineer, within reasonable distance of the installation site. (should this require any machine over 15kg lifting any distance greater than 1 meter assistance must be available)
Ensure the relevant product ingrediants are to hand
The engineer WILL:
Unpack the machine and inspect for transit damage.
Install the machine in its proposed location.
Connect power and water to the machine.
Commision the machine and function test to ensure it is operating to factory specifications.
Set the machine to any requirement the site may have - drink strength, cup size etc.
Train staff in maintenance, cleaning and operation.
Leave the area tidy, with the packaging flat-packed for the sites disposal.
Install Brita water warranty equipment were requested.
Bravilor DOES NOT authorise its service agents to:
Change the power supply cable already attached to the machine.
Connect the units to services over 1 meter away from the machines centre line. This is due to local authority bylaws, in most counties.
Modify the machines functions or programming to alter the machines designed manufactured purpose.
Any such changes without written consent from Bravilor Limited, would immediately invalidate the warranty.
View all products in
Commercial Coffee Machines